Skip to content
26 Dizengoff, Netanya
GIIProperty management in Israel

6 October 2026 · Leases and tenancies

Defective Elevator: Is the Builder Required to Fix It Before Handing Over the Keys?


The builder cannot force you to accept a defective mamad just because the delivery date is approaching. In Israel, receiving the keys does not mean you waive your rights if you documented the issues before moving in. The key to negotiation lies in distinguishing between structural defects and minor workmanship errors, and in your ability to withhold part of the purchase price rather than refusing acceptance. Acting quickly, with a written technical report, is the only way to compel the company to intervene before you become liable for maintenance fees and municipal taxes.

Handing over the keys does not mean acceptance: the bedek bayit mechanism

In the United States, the inspection of a new property is governed by strict protocols and standard checks. In Israel, the system relies on proof. The handover of keys is often accompanied by a formal report, but its absence does not prevent you from occupying the unit. If you enter the apartment without documenting defects in writing, the builder may claim tolerance or normal wear and tear to refuse any intervention. This is where the bedek bayit becomes essential. It is not a legal inspection mandated by the state, but a building inspection performed by a professional. Without this report, you are alone against the builder’s word.

The order of operations is crucial. You must have defects certified by an architect or engineer before taking the keys, or immediately after if you are already on site. The report must precisely list visual and functional anomalies: cracks, poorly sealed joints, doors that do not close properly. This document becomes your evidence in case of dispute. Be aware of the trap of the arnona. As soon as the keys are handed over, you become liable for the municipal residence tax paid to the city. The builder cannot delay corrections by blocking the payment of this tax, but you must act quickly to preserve your warranty rights. If you delay, the builder will argue that you accepted the condition of the property through your inaction. Do not let time work against you. The speed of the documentation is your best weapon.

The shtar ‘hov and financial pressure: understanding the builder’s leverage

The builder often refuses to correct defects because it wants to collect the final balance before assuming repair costs. It uses the shtar ‘hov, a promissory note or debt acknowledgment signed by the buyer, to force payment. This is not insurance; it is an obligation to pay. The builder knows that an owner who refuses the handover of keys risks facing contractual late penalties or lawsuits for non-payment. It exploits this fear.

The distinction between major and minor defects is central. The builder will rarely accept to correct structural cracks, as this engages its civil and technical liability. Conversely, it will often refuse aesthetic workmanship errors (painting, tiling) by arguing that this delays delivery and affects its cash flow. Your strategy should be to withhold a portion of the shtar ‘hov or the final payment until the defects are resolved, rather than refusing the handover of keys. This is a financial negotiation, not an immediate legal standoff. If you are a tenant and the landlord is the builder, the pressure passes through the arev (the guarantor). Refusal to correct may constitute a breach of the lease, engaging the guarantor’s liability if the tenant leaves the premises. Understanding this financial mechanism allows you to negotiate with precision, targeting the amounts to withhold rather than blocking the entire process.

The land registry (tabou) and blocking property ownership

Property transfer does not happen at the key handover, but at registration in the tabou, the land registry. The builder cannot prevent you from registering your name, but it can delay the procedure to maintain pressure. This is a common, if not illegal, practice. Some builders refuse to transmit the documents necessary for registration until the works are completed. They use this blockage to force you to accept defects or pay the balance without retention.

In the United States, a title company or attorney manages the transfer and secures the transaction. In Israel, the owner often has to manage the procedures with the Lands Authority themselves. This makes the power dynamic more direct with the builder. The legal solution is to petition the court to force registration in the tabou. Once registered, you are the legal owner. The builder must then fulfill its contractual obligations under threat of legal action. You can also contact the reshut ha-misim (the tax authority) to report the blockage, as this affects tax payments. This administrative pressure mechanism is effective. Do not let the builder block your property title to force your hand. Registration in the tabou is your shield. It transforms your position from debtor to creditor, capable of demanding repairs without fearing the loss of the property.

Legal warranty and the distinction between “construction defect” and “wear and tear”

The law on real estate warranties distinguishes between hidden defects, not visible at acceptance, and apparent defects. If you signed the acceptance report without reservation, apparent defects are considered accepted. This is why the bedek bayit is indispensable. It transforms an apparent defect into a documented defect, making it contestable. The builder cannot invoke normal wear and tear for construction flaws that appear immediately after the handover of keys.

The case of the mamad is specific. The secure room must comply with safety standards. If the mamad door is defective or the insulation is insufficient, it is a safety defect, not an aesthetic detail. The builder has the obligation to correct it. Similarly, the doud shemesh (solar water heater) and the mazgan (air conditioner) are essential equipment. If they do not function, it is a major defect. The builder must provide spare parts or replace the equipment. It cannot invoke a “breakdown” as an excuse. The warranty covers non-compliance, not obsolescence. The distinction is fine but decisive. A construction defect is a flaw that existed at delivery. Wear and tear is the effect of time. Your technical report must clearly establish that the anomalies are manufacturing or installation flaws, not consequences of use. This legal qualification is the basis of your claim.

Negotiating the retention of funds: the practical method

Refusing the handover of keys is a risky option. It exposes you to penalties and loss of control over the schedule. The safer method is to negotiate a retention of guarantee. You accept the handover of keys, but you withhold a portion of the purchase price, corresponding to the estimated cost of repairs. This retention is negotiated in an addendum to the contract. It must be proportional to the defects observed. If the defects are minor, the retention will be low. If they are major, it can cover the cost of labor and materials.

This method has the advantage of giving you control. You are the owner, you pay the arnona, but you do not pay the balance until the works are done. The builder is incentivized to intervene quickly to recover its funds. You can also require that repairs be performed by a company of your choice, rather than by the builder’s team. This avoids conflicts of interest and guarantees quality. The negotiation must be in writing. Any verbal agreement is difficult to prove. Use the bedek bayit report as the basis for negotiation. Quantifying the costs (via professional quotes) gives weight to your request. Do not let the builder decide the amount of the retention alone. You determine the amount, based on technical evidence.

The role of the attorney and the mediation procedure

If negotiation fails, the intervention of an attorney is necessary. In Israel, real estate disputes are frequent and courts are accustomed to these cases. The attorney can send a formal demand letter, which changes the dynamic. The builder, faced with judicial proceedings, is often more inclined to yield. Mediation is an effective intermediate step. It allows finding an agreement without going through the courts, which is faster and less costly. The attorney can also petition the family court or the civil court, depending on the nature of the dispute. It is crucial to choose an attorney specialized in real estate law, not a generalist. The nuances of Israeli law, particularly regarding warranty and the tabou, require precise expertise. The attorney can also verify if the builder respected the late penalty clauses provided in the contract. If the builder delayed delivery, you can demand damages, in addition to repairs. This dual claim strengthens your position. Do not underestimate the value of a well-conducted procedure. It is often more effective than simple negotiation.

The case of a defective mamad: a concrete example

Imagine an apartment in Netanya. The mamad has a door that does not lock correctly. The sound insulation is insufficient; conversations are heard from the hallway. The doud shemesh does not heat the water. The builder refuses to correct these defects before the handover of keys, arguing that they are “details” to be fixed later. You have a bedek bayit performed. The report lists the three defects. You negotiate a retention of funds covering the replacement of the lock, sound insulation, and repair of the water heater. The builder accepts a partial retention but refuses to pay for the insulation. You appeal. The attorney demonstrates that sound insulation of the mamad is a safety and comfort requirement, not optional. The builder eventually agrees to cover all three items. You receive the keys, pay the arnona, and the works are performed under your supervision. This case shows the importance of documentation and persistence. The builder yielded because it understood that you were determined and well-informed.

Rental management and follow-up after key handover

Once the deed is signed and defects corrected, the next question arises: who manages the property on a daily basis? If you reside in the United States, you cannot monitor the apartment yourself. Who receives the keys? Who finds the tenant? Who responds when a pipe bursts on a Friday? These are concrete questions that cannot be resolved by phone. Professional rental management takes over. We manage the entire process: tenant search, lease drafting, rent tracking, and intervention in case of technical problems. We know local standards, trusted suppliers, and legal procedures. We ensure a rapid response to incidents, which preserves the value of the property and tenant satisfaction. This link to our rental management allows you to discover how we secure your investment. Do not let daily management escape you. A well-managed property is one that generates returns and lasts. For more information on the legal and tax aspects of your acquisition, consult our guide for buying or selling in Israel. And if you are still in the negotiation phase with the builder, read our article on the builder silent on the defects of a new mamad before key handover in Israel. Finally, if you have already signed but works are in progress, this article on works between signature and key handover: your obligations in Israel will help you clarify your responsibilities.

Never sign an acceptance report without having defects certified by a professional. The bedek bayit report is your only proof. Without it, the builder can invoke normal wear and tear. Act before touching the keys, or immediately after. Financial negotiation (retention of funds) is more effective than refusing acceptance. And once you are the owner, entrust management to a professional to avoid incidents that degrade your property.

GII, Gestion Immobilière en Israël

Gestion locative en Israël pour propriétaires francophones. Bureaux à Netanya, 26 Dizengoff. Une question sur votre bien ? Écrivez-nous.

À lire ensuite

Votre bien mérite mieux qu’un article

A few minutes are enough to locate your property, estimate a realistic rent and tell you exactly what management covers. In French, with no commitment.

Or fill in the form, we will call you back.

Accessibility

WhatsApp